Crocodile cracking

Crocodile cracking: definition, and causes of crocodile cracking

Crocodile cracking is a type of crack that occurs on the surface of an asphalt paved road as a result of repetitive distress or flexing under stress. This type of cracking resembles the skin of a crocodile or alligator. As a result, it’s also interchangeably referred to as alligator cracking. There are different levels of severity depending on the extent of damage. The simplest or earliest stage of the cracking are longitudinal cracks which may or may not interconnected resembling a hairline fracture. The next stage is more severe where the surface cracks into a network of pieces which are interconnected known as spalling of the surface. This stage can be defined as an intermediate stage of severity. The final and more advanced stage resembles the skin and texture of a crocodile which means more pronounced cracks which are chunks of asphalt which can lead to hazards. By this stage, the fixing of the cracks at a surface level is often not possible and demands road closure to avoid accidents. Crocodile cracking is often localised and if the subgrade is severely impacted may have repetitive regions of breakdown. Crocodile cracking is a type of fatigue cracking that refers to a general type of cracking which is caused by iterative traffic loads, over a period of time. Repetitive surface stress on the asphalt pavement in sections where the tensile strain and stress are high under vehicular loads leads to deformation. This repetitive flexion or bend leads to interconnected cracks, which spread and propogate further at right angles as more time passes. There are three contributory factors that lead to crocodile cracking: namely freeze-thaw cycles, water intrusion into the subgrade, or lastly, subgrade compromise due to water softening from leakage leading to deformation. Crocodille cracking can also be bifurcated based on whether it’s under the path of a wheel, or wheel path, or non-wheeled path. If cracks appear along a wheel path, along the length of the road, or pavement, it’s largely attributed to fatigue under loads. However, if it’s not under a wheel path, yet parallel to the centre of the pavement, we can assume these type of cracks are due to the subgrade being impacted by moisture content, leading to cracks in the surface. These point more to the quality of the construction than surface level cracks caused by pressure.

Common instances of crocodile cracking:

There are some asphalt roads that are more prone to crocodile cracking than others. Typically, higher than planned vehicular load leads to asphalt pavement cracking. Therefore, airports, haul roads, industrial areas, residential roads with water logging, and busy intersections are often more likely to develop this distress. Cylical exposure to loads leads to formation of these cracks, or holes. While one can resurface these pavements, often this is a temporary solution as the cracks just propogate to a new layer, leading to a phenomenon called “reflective cracking”. In essence, an asphalt overlay on top of a cracked paved road is a temporary solution if there are more fundamental problems. Asphalt degradation can be attributed to one of three causes: environmental causes, repetitive stress of traffic, or inferior construction quality.

How to avoid crocodile cracking?

By providing tensile reinforcement within the pavement structure, geogrids distribute the tensile stresses induced by traffic loads evenly. This redistribution of stresses prevent the formation of localized areas of high strain, known as stress concentrations or “peaks,” at the bottom of the asphalt layer. Geogrids reduce the development of peaks in strain at the bottom of the asphalt layer in a paved road. These peaks in strain, if left uncontrolled, can lead to premature pavement failure and reduce the service life of a road expanse. Geogrid acts as a reinforcement layer that interlocks with the surrounding soil and asphalt layers.

Leave a comment

Your email address will not be published. Required fields are marked *

Need a consultation? We’re at your service.

Tell us a little about yourself and what you’re looking for, and our experts will get back to you with a perfect solution!

Harold W. Hill, Jr

Director, President – Glen Raven Technical Fabrics

Strata/Glen Raven tenure: 10 years/28 years
Total industry experience: 35 years


MBA – Wake Forest University

 

Directs the strategic direction of Glen Raven’s automotive, protective apparel, military, geogrid, outdoor and logistic businesses.

J. Craig Bell

Director, General Manager, Strata Inc.

Strata/Strata Inc. tenure: 3 years/14 years
Total industry experience: 25 years


MBA – Georgia State University

 

Led the integration of Strata Inc. business operations into the headquarters of GRTF and transition from USA based to India based manufacturing.

Ashok Bhawnani

Director

Strata tenure: 17 years
Total industry experience: 47 years

CA – ICA

 

Played a key role in the establishment of Strata’s India operations. Provides vision for product innovation and leveraging new technology trends.

Phil McGoldrick

Global Technical Sales Director

Strata tenure: 7 years
Total industry experience: 32 years


Civil & Geotechnical Engineer (First class)


Provides highly technical and innovative civil engineering solutions in India and around the world. Responsible for the design and execution of large-scale geotechnical projects around the world including Australia, Asia, Europe, Africa, Middle East, and South America.

Shahrokh Bagli

CTO – Chief Technology Officer

Strata tenure: 9 years
Total industry experience: 48 years


BTech (Hons), MTech (Civil) Both IIT Bombay, DMS (Bombay University), FIE, FIGS, Chartered Engineer

 

Streamlines the designs of Geosynthetics and has brought innovation in geogrid and geocell design application.

Mujib Katrawala

COO – Projects and Sales

Strata tenure: 13 years
Total industry experience: 24 years


MBA – University of Gujarat

 

Leads the monetization of products and solutions while ensuring highest execution quality and project profitability.

Chandrashekhar Kanade

COO – Technical Textiles

Strata tenure: 13 years
Total industry experience: 33 years


BE (Mechanical) – Nagpur University

 

Drives excellence in process design, product features and cost effectiveness in production.

Govind Keswani

CFO – Chief Financial Officer

Strata tenure: 8 years
Total industry experience: 35 years


CA – ICA, ICWA – ICWAI

 

Leads the finance, accounting, taxation, commercial, legal and IT functions and assisting on all strategic and operational matters.

Gautam Dalmia

CDO – Chief Development Officer

Strata tenure: 10 years
Total industry experience: 13 years


MBA – ISB, Hyderabad

 

Leads diversification of the product portfolio, monetizing the new products and ensuring successful sustained financial growth of the company top line.

Narendra Dalmia

CEO – Chief Executive Officer

Strata tenure: 14 years
Total industry experience: 42 years


B Tech (Chemical) – IIT Delhi

 

Leads day-to-day business operations of the company with focus on capacity expansion, product and process improvement.

Need a consultation? We’re at your service.

Tell us a little about yourself and what you’re looking for, and our experts will get back to you with a perfect solution!